THE BRIEF
Following a massive refurbishment at the British Cycling Velodrome in Manchester, we designed and installed a multi-room audio system for the Gym and Teams Rooms video conferencing meeting rooms in the new offices.
The scope of works included:
- Multi-Zone audio for the gym and recovery room.
- Multiple video display installation with option to video matrix.
- Open meeting area for Teams to feed multiple screens for colaboration.
- Three Teams Rooms meeting rooms.
Following our meeting and site visit we quickly designed the systems necessary to meet the needs of the client and decided on a plan of action to have the work completed by our skilled technicians in the short time we had available.
Our installation team were able to hide the cable for the speakers, screens and networks in the ceilings and walls which also allowed the engineers to fit the speakers discretely and place the video equipment away from any unnecessary access.
Network switches were installed in the communications room for the wired network infrastructure and the wireless access points.
The project was completed on time and the client was extremely happy with the result, and with the professionalism and speed of the work.
To speak to us about your project contact us now.
Contact Us
Manchester Office : 0161 238 4937 | Cheshire Office: 01565 756 111